Did you buy chance tell vectric you were zeroing on the Bed and not the top of the work piece?
It must be a misprint because just below it says 70" by 70" [ATTACH]
I always go with 1/2 of the endmill diameter. I may go deeper if there is a small step over, but I usually default to 1/2 diameter.
Is it a 3 axis controller where one is utilized as the rotary axis when in that mode? If so and the controller is GRBL based, the n the Rotary...
Not every company uses the same color scheme. I believe you said yours were not from OpenBuilds so you need to verify your wire pairs using this...
Sorry, I have been traveling for work a lot lately so I am slow to respond. I do not really know how to describe the sound other than it sounds...
I run the same doc and feed rate as you posted above but at about 16000 rpms and do not experience chatter. I do try to insert the endmills in as...
If you download the step file provided, open in Fusion 360, and change the units to mm you can get what you need. I do everything in mm so mine is...
If there is a break inside the wire, it may not show up as a problem until the machine is in motion and the cable starts flexing. A simple test is...
When you close a Vcave file, it will not close without asking you if you want to save the file. It may be that your Vectric CRV file (.crv) was...
The Openbuilds post processors require that your machine is homed at start-up for the day. That lets the machine know where it is in the Machine...
I use two mounts. One up towards the top and one at the tool end. It works great for me.
Out of curiosity, and it probably shouldn't matter since the gcode should cause it to cut in mm, but is OpenBuilds control set to mm, or inches...
C): the z-1 is the first Z move. If you open the gcode file in a text editor, you will be able to see that later on, it caves to a depth of Z -...