Anybody find a way to get a more accurate time from fusion/open builds control to be more accurate? fusion is telling me a run time is 16min 33sec. its a parallel path 1/4" ball end mill .005" step over. the time in OB control counts down but when one second ticks away on there its really like 5 on a timer... any way to get better estimates?
It is merely an estimate. Is Fusion’s guess accurate? Its hard to account for different machine setting when calculating an estimate (unknown acceleration and maximum feed settings)