Hi there, recently I have a problem about software interruption during the operation, suddenly the program stopped with this message: Homing fail, could not find limit switch within search distance. defined as 1.5 * max_travel on search and 5 * pulloff on locate phase. $H
Check that your Maximum Travel values in Grbl Settings match your actual machine's movable workarea, and use the Troubleshooting tab to make sure all your limit switches are working correctly
Tanks peter, could you tell me how I can continue my graving program after an interruption without comme back the first command in program, because just after interruption, I have to run the program at first command another one.
Manually edit the gcode. As earlier modals have to present, and the machine has to have custom position moves to position it ready to enter the first point you want to resume from without crashing. Its too hard to automate, best left to humans with experience. Or if you can re-cam to exclude already done sections.