Hello, I was just curious where you all route your wires and tubes for dust extraction and wiring? I have a modular enclosure that I built but haven't used yet because I don't want to drill into the Polycarbonate walls. Though, even if I did drill a hole in it, do you go through the top? The back? The side? What location did you pick? A lot of guides and videos seem to hide the hire management. I was thinking about lifting the entire enclosure up on an extra set of aluminum extrusions with a little notch/hole for the wires/tubes. Regards, Dave